Earn from every boiler you sold
Never miss a renewal you could have serviced
The desk reads the dates on every boiler and lists what falls due: certificates within 90 days and once lapsed, AMC visits within 14 days, AMCs and warranties ending within 60. Each is a reason to call a plant that already trusts your boiler.
- Certificate renewals 90 days ahead, and lapsed certificates first
- AMC visits spread over the contract year, from the last visit done
- AMCs and warranties about to end: the moment to offer a renewal
- All of it on the overview every morning

AMC and certificate reminders
How it works
Record the dates
Certificate valid till, warranty till, and the AMC’s start, end and visits a year, on each boiler.
See what falls due
The overview and the installed base list each item with how many days are left.
Call the plant
Open the boiler, call or WhatsApp the contact, and log the visit as a service request.
Close the visit
Marking an AMC visit done moves the next one forward by the contract’s interval.
Who it's for
Makers who sell AMCs but find out a visit was missed when the plant complains, and makers who do not yet sell AMCs and want a list of the plants to offer one to. It fits any maker with boilers running under the Boilers Act, whose owners need their certificate renewed in time.
Why it matters
A boiler cannot lawfully run once its certificate for use has lapsed, and renewing it means an inspection the boiler must be ready for. A plant reminded months ahead books your engineer to prepare the boiler. A plant reminded by its own lapsed certificate calls whoever is free. The same is true of an AMC renewal or a warranty that is about to end: the first maker to call usually gets the contract. The same list is also the most reliable source of service revenue you have. Each item on it is a plant that already owns your boiler and needs something done by a date it cannot move.
What's included
Certificate tracking
The date on the certificate, whatever its period, with renewals listed 90 days ahead.
AMC visit planning
Visits spread evenly over the year: a quarterly AMC is due every 91 days from the last visit.
Renewal prompts
AMCs ending within 60 days, and warranties ending with no AMC after them.
On the plant’s page too
The nameplate page warns the plant when its certificate is within 30 days or has lapsed.
A morning list for the service team
The overview's coming-due list is the service manager's to-do list: call these plants, plan these visits, renew these contracts.
Lapsed first
Boilers whose certificate has already lapsed are listed above everything else, because each of them is a plant that should not be running its boiler.
FAQ
Questions owners ask
- Does the desk renew certificates?
- No. Renewal is between the boiler’s owner and the inspecting authority. The desk makes sure you and the plant see it coming, so the boiler is ready when the inspector comes.
- How long is a certificate valid?
- For the period written on it. The desk tracks the date you enter rather than assuming one, because periods and rules differ by state and changed with the Boilers Act, 2025.
- Are reminders sent to the plant automatically?
- The plant sees a warning on its nameplate page within 30 days of the date. Reminders by email or WhatsApp are on the way; today your team calls from the due list.
- Can we change how far ahead items appear?
- Today the windows are fixed: 90 days for certificates, 14 for AMC visits and 60 for AMC and warranty ends. Tell us if your plants need longer notice and we will look at making them adjustable.
- Do retired boilers keep appearing?
- No. Mark a scrapped or replaced boiler as retired and its reminders stop, while its history stays on record.
Guides to go deeper
All guides
Planning Boiler Certificate Renewals Under the Boilers Act, 2025
Why a boiler's certificate for use must not lapse, what plants usually prepare for the renewal inspection, and how makers help plants plan it months ahead.
4 min read

Building an AMC and Spares Business on the Boilers You Have Sold
How boiler makers turn their installed base into steady AMC, spares and service income: the register, the offer at warranty end, visits and the nameplate QR.
4 min read
Earn from every boiler you sold